The much anticipated expansion project for the Emergency Dorm took place this week. The crews arrived early on Wednesday (6:am) and had all the framing up and bolted to the floor by 9:00 a.m.! The place was buzzing with construction crews with well over 100 people working on the dorm at one point. The project didn't start without a hitch though, in prepping the dorm the day prior, removing old lockers revealed a severe water leak from the shower that had rotted a good 200+ square feet of sheet-rock. Without fail, HomeAid came through and secured in-kind help replacing the rotted wall, mudding and painting - all just in time for the big day!